[Previous] -- [Matt's 2-6-6-6 Allegheny] -- [Next]
Here is a front view. The front detail below the boiler was some of the most challenging and fun building on this model. The linked wheel set here includes the front guide wheels (12V wheels) and the first set of 6 driver wheels. The wheels are all stud-down, so the front detail had to incorporate that and convert to stud-up before the railing detail at the headlight level. The bell on top is the same piece I used for the headlight.
[Previous] -- [Matt's 2-6-6-6 Allegheny] -- [Next]